Skip to content

On site across Algeria

Migration and modernisation of your machines

Your machine still runs, but its PLC, screen or drive is no longer made. The day it fails, you won’t find the part and the machine stops. We replace the old hardware with current hardware, keeping the machine working the same way, so it runs for years more.

What we replace

  • Old Siemens PLC (S7-200, S7-300) to S7-1200 or S7-1500 (TIA Portal)
  • Old PLC of another brand (Schneider, Omron, Mitsubishi, LOGO!, Zelio…) rewritten on a current PLC
  • Old relay-and-timer cabinet replaced by a PLC: fewer breakdowns, faults easier to find
  • Obsolete or broken HMI replaced by a current screen, with the screens rebuilt
  • Old or unobtainable drive replaced by a current model or another brand, settings carried over

How we work

  • We record what exists: program, wiring diagram, settings, and how the machine runs today
  • We back up the old program before touching anything
  • We prepare the new program and wiring in advance, to stop the machine as short a time as possible
  • We install, test with your operators, and hand over the updated program and diagrams

Examples already done

  • Siemens ET200 and KTP1200 screen upgrade (Algiers metro)
  • PLC and screen retrofit of a carton production line
  • SEW drive replaced by an ABB ACS150
Migration and modernisation of your machines

Brands and software

  • Siemens S7-200/300/1200/1500
  • Siemens LOGO!
  • Schneider Modicon
  • Schneider Zelio
  • Omron
  • Fatek
  • LS (XGB/XGT)
  • Xinje
  • Delta
  • Mitsubishi
  • ABB
  • Schneider Altivar
  • Siemens Sinamics
  • Danfoss
  • LS
  • INVT
  • Delta

How it works

  1. 1

    You describe the machine or the project by phone, WhatsApp or with the form (photos and part numbers welcome).

  2. 2

    We study the need and send you a free quote before any work.

  3. 3

    We work on site or in the workshop, with tests and a backup handed over at the end.

Frequently asked questions

My machine still works: why modernise it now?

Because the day the old PLC or drive fails, the part is unobtainable or very expensive, and the machine can stay stopped for weeks. Replacing it before lets you choose when the machine stops.

I no longer have the old PLC’s program: is it possible?

Often yes. If the PLC allows reading, we recover the program. If not, we rewrite it by watching how the machine works, with your operators.

My machine uses relays, with no PLC: can you move it to a PLC?

Yes. We record the relay and timer diagram, write the program on a current PLC and rewire the cabinet. The machine does the same thing, with fewer breakdowns.

How long will the machine be stopped?

We prepare the program and wiring in advance so the stop is as short as possible. The exact time depends on the machine and is stated in the quote.

How much does a migration cost?

It depends on the size of the machine and the hardware to replace. Send photos of the cabinet and the devices’ part numbers on WhatsApp: the quote is free.

Tell us about your machine

Quick answer by phone or WhatsApp, free quote before any work, anywhere in Algeria.

Request a quote

Describe the fault or the project, and we will reply quickly with questions or a proposal.

Please give at least a phone number or an email so we can reply.

Photos (optional)

Nameplate, board, panel or fault code on the display: up to 3 photos to help us understand the fault.

Send via WhatsApp